Warning: Creating default object from empty value in /home/osusume/www/wp_shutaro/wp_tuapeka/wp-content/themes/coda/functions/admin-hooks.php on line 160

From The Blog

Linear turbine tests Heathcote river April 14, 2014

Linear turbine test Heathcote river Christchurch April 14, 2014. Pumping water to 5 meters high.

Mini linear turbine test Heathcote river Christchurch April 14, 2014. Pumping water showing low head approx 1 meter, and high head approx 6 meters.

Mini Linear turbine test Heathcote river Christchurch April 14, 2014. Showing vane operation, and pumping water to 6 meters.

Mini linear turbine test Heathcote river Christchurch April 14, 2014. Driving treadmill generator/motor to power car tail light, and pumping water. Speed slows down considerably when flow blocked by photographer’s legs standing upstream of vanes.

Tags: 


Warning: count(): Parameter must be an array or an object that implements Countable in /home/osusume/www/wp_shutaro/wp_tuapeka/wp-includes/class-wp-comment-query.php on line 405


No comments yet.

Leave a Reply